What can be found in Appendix V?
Samples of Calculation Sheet of Combination of TCPs.
What should the RC do in case of doubt regarding the effect of temporary works?
Consult RSE/RGE and submit the design of the temporary works.
1/211
p.6
Technical Competence of Supervisors

What can be found in Appendix V?

Samples of Calculation Sheet of Combination of TCPs.

p.24
Quality Supervision Requirements

What should the RC do in case of doubt regarding the effect of temporary works?

Consult RSE/RGE and submit the design of the temporary works.

p.27
Regulatory Framework and Compliance

What is required of the relationship between the DE and ICE?

They must be independent from each other with no holding, subsidiary, employer/employee, or any other relationship.

p.28
Temporary Works and Their Management

What forms must the RC submit to the AP for record before the commencement of works?

Duly signed Forms TW1 and TW2.

p.4
Regulatory Framework and Compliance

Where can the Code be viewed?

On the Buildings Department website www.bd.gov.hk under the 'Codes, design manuals and guidelines' page.

p.12
Safety Management in Building Works

What is the role of the Authorized Person (AP) in the safety management structure?

To oversee engineering safety supervision.

p.24
Roles and Responsibilities of Personnel in Site Supervision

Who must certify the plans and construction drawings for temporary works?

A person at T5 or equivalent level (T5 Person).

p.10
Roles and Responsibilities of Personnel in Site Supervision

What is the accountability structure for safety management personnel?

The Representative is accountable to the head, while all other personnel are accountable through the Representative.

p.7
Quality Supervision Requirements

What does Quality Supervision ensure?

That building works are carried out in accordance with the Buildings Ordinance and approved plans.

p.7
Safety Management in Building Works

What is the focus of Site Safety Supervision?

Controlling hazards to minimize risks to workers, nearby persons, and adjoining structures.

p.14
Roles and Responsibilities of Personnel in Site Supervision

Who is the personnel accountable to for the implementation of the supervision plan?

The AP, through the AP’s Representative.

p.5
Technical Competence of Supervisors

What is the focus of Section 7?

Building Works with Significant Geotechnical Content.

p.11
Safety Management in Building Works

Who is responsible for ensuring that Representatives and TCPs are aware of task-specific requirements?

The respective heads of the safety management structure.

p.17
Roles and Responsibilities of Personnel in Site Supervision

What is one of the overall responsibilities of the RGE?

Assuming overall responsibilities in the appointment of his Representative and TCPs.

p.17
Quality Supervision Requirements

What is a duty of the RGE concerning site inspections?

Carrying out site inspections as necessary.

p.11
Quality Supervision Requirements

What must be ensured regarding the frequency level of inspection for TCPs?

It must not be less than that required under Table 1 of the Technical Memorandum and this Code.

p.17
Safety Management in Building Works

What responsibility does the RGE’s Representative have regarding safety measures?

Taking overall responsibility to check if the safety measures on site meet with the requirements of supervision plans.

p.31
Temporary Works and Their Management

What is the first step in the flow chart for temporary works supporting a tower crane?

The DE prepares and signs the plans and construction drawings with design justifications and certifies in Form TW1.

p.22
Temporary Works and Their Management

What is the primary responsibility of the AP/RSE/RGE/RC regarding temporary structures?

To ensure the integrity of the temporary structure and associated fixing methods.

p.4
Amendments and Revisions in Supervision Codes

When was the latest revision of the Code made?

August 2024.

p.26
Temporary Works and Their Management

What should the RSE/RGE check regarding proposed temporary works?

If they have any effect on permanent structures, adjoining buildings, lands, or geotechnical elements.

p.7
Supervision Plans and Procedures

What does the Code of Practice for Site Supervision provide?

Detailed guidance on the application of the Technical Memorandum and good practices for site supervision.

p.26
Temporary Works and Their Management

What may the RSE/RGE require from the RC?

Further information to substantiate the effect of the temporary works.

p.8
Safety Management in Building Works

What does the Code outline about safety management?

It outlines the principles of safety management structure within each functional stream and the responsibilities of personnel.

p.23
Safety Management in Building Works

What is the RC's responsibility regarding temporary works?

Ensuring the integrity and safety of the temporary works.

p.8
Technical Competence of Supervisors

What are the qualification requirements for TCPs mentioned in the Code?

The Code specifies qualification and experience requirements for each grade of TCP.

p.13
Roles and Responsibilities of Personnel in Site Supervision

What must the AP ensure regarding the supervision plan?

Full implementation of the supervision plan regarding his own stream.

p.23
Regulatory Framework and Compliance

What should the RGE ensure regarding temporary works?

That they have no adverse effect on geotechnical elements of permanent structures.

p.16
Reporting and Communication Protocols

What should T5 do in case of non-conformities?

Refer to the RSE’s Representative and notify TCPs in other streams.

p.6
Technical Competence of Supervisors

What criteria are discussed in Appendix X?

Other Acceptable Criteria in Qualifications and Experience for TCP.

p.27
Technical Competence of Supervisors

What qualifications must a design engineer (DE) have for temporary works supporting a tower crane?

A minimum qualification of a registered professional engineer (civil/structural) with at least 5 years of relevant working experience.

p.23
Temporary Works and Their Management

What should the RC prepare for temporary works?

Plans and construction drawings with design justifications.

p.22
Temporary Works and Their Management

What should the RC do in Case 2 when temporary works are not shown on prescribed plans?

Prepare plans and construction drawings with design justifications for the temporary works.

p.14
Quality Supervision Requirements

What is a key responsibility of the personnel regarding non-conformities?

Dealing with non-conformities and site incidents.

p.7
Regulatory Framework and Compliance

Which documents should be referenced apart from the Technical Memorandum?

The Buildings Ordinance, Practice Notes for Authorized Persons, Registered Structural Engineers, and Registered Geotechnical Engineers.

p.14
Supervision Plans and Procedures

What should be maintained on-site regarding supervision?

Registers of all relevant site supervision plans, reports, documents, and correspondence.

p.18
Roles and Responsibilities of Personnel in Site Supervision

Who is accountable for the implementation of the supervision plan?

The individual is accountable to the RGE through the RGE’s Representative.

p.26
Quality Supervision Requirements

What must the RC ensure regarding the temporary works?

They are carried out in accordance with certified plans and are structurally safe.

p.11
Roles and Responsibilities of Personnel in Site Supervision

Can TCPs of higher grades take up responsibilities of lower grades?

Yes, TCPs of higher grades may take up the responsibilities of those of lower grades.

p.10
Roles and Responsibilities of Personnel in Site Supervision

What must the AP, RSE, and RGE ensure regarding the RC?

That the RC is fully aware of any task-specific requirements shown on the approved plans.

p.7
Safety Management in Building Works

What are the two types of supervision addressed in safety management of building works?

Quality Supervision and Site Safety Supervision.

p.10
Roles and Responsibilities of Personnel in Site Supervision

Who should be the highest grade TCP within their respective stream?

The Representative.

p.5
Quality Supervision Requirements

Which section discusses Quality Supervision Requirements?

Section 6, pages 40-50.

p.12
Safety Management in Building Works

What is the function of the Registered Geotechnical Engineer (RGE)?

To oversee geotechnical safety and compliance.

p.5
Reporting and Communication Protocols

What does Section 10 address?

Communication and Reports.

p.26
Temporary Works and Their Management

What must the RSE/RGE provide after verifying safety and integrity?

Written permission to the RC for carrying out the works.

p.19
Quality Supervision Requirements

What action should be taken regarding non-conformities?

Non-conformities must be immediately acted on and rectification carried out forthwith.

p.5
Quality Supervision Requirements

What does Appendix III contain?

Form B: Non-conformity and Rectification Reports.

p.6
Quality Supervision Requirements

What does Appendix IX focus on?

Key Records on Quality Supervision of Soil Nailing Works.

p.18
Reporting and Communication Protocols

What should be done in case of non-conformities and site incidents?

They should be referred to the RGE’s Representative and TCPs in other streams should be notified.

p.26
Reporting and Communication Protocols

What is required to be submitted to the RSE after completion of the temporary works?

The completion certificate within 7 days.

p.9
Amendments and Revisions in Supervision Codes

What factors should the BA consider when adjusting supervision requirements?

The prevailing state of technology and methods of construction.

p.26
Quality Supervision Requirements

What should the RSE check regarding the completion certificate?

The completeness and that it certifies the temporary works were completed safely.

p.25
Supervision Plans and Procedures

What types of structures are mentioned for falsework requirements?

Transfer plates, vehicular ramps, cantilevered slabs, beams, elevated water tanks, space frames, vehicular bridges, footbridges, and prestressed structures.

p.19
Quality Supervision Requirements

What is one of the duties of the RC regarding site inspections?

Carrying out site inspections as necessary.

p.18
Technical Competence of Supervisors

What must be validated on site related to design assumptions?

Conditions that relate to temporary or permanent structures.

p.30
Temporary Works and Their Management

What must the RC submit for a free-standing tower crane?

Relevant documents of temporary works, including certified plans and signed Forms TW1, TW2, and TW3 to the RSE within 7 days.

p.30
Reporting and Communication Protocols

What is the RSE's responsibility after receiving documents from the RC?

To submit them to BD for record within 14 days after completion.

p.21
Quality Supervision Requirements

What must personnel check to ensure compliance with approved plans?

That actual site conditions and works being carried out agree with the approved plans, design requirements, and method statements.

p.12
Safety Management in Building Works

Who represents the Authorized Person (AP)?

The AP’s representative.

p.7
Supervision Plans and Procedures

What document sets out the principles and requirements for supervision plans?

The Technical Memorandum for Supervision Plans.

p.24
Temporary Works and Their Management

What is required if temporary works provide support to a tower crane?

Follow additional requirements as described under paragraph 4.12 of the Code.

p.22
Temporary Works and Their Management

What is the RC's sole responsibility in Case 2?

To ensure the integrity of the temporary works and ensure safety for workers, the public, and adjoining properties.

p.6
Roles and Responsibilities of Personnel in Site Supervision

What does Appendix VI provide?

Samples of Checklist and Record of Specific Tasks Performed by TCP.

p.14
Quality Supervision Requirements

What must personnel check to ensure compliance?

That specified aspects of works comply with approved plans, design requirements, and method statements.

p.25
Supervision Plans and Procedures

What is the height threshold for columns and walls that require design justifications?

Exceeding 6 meters.

p.22
Temporary Works and Their Management

What additional requirements must be followed for temporary works providing support to a tower crane?

Additional requirements as described in paragraph 4.12 of the Code should be followed.

p.5
Supervision Plans and Procedures

What is included in Appendix I?

Standard Form of Supervision Plan with Confirmation of Appointment and Contact Information of TCPs.

p.6
Supervision Plans and Procedures

What administrative procedures are outlined in Appendix VIII?

Administrative Procedures for GIFW.

p.9
Supervision Plans and Procedures

What should be provided during the critical stages of building or street works?

Additional site supervision requirements.

p.19
Supervision Plans and Procedures

What is one of the duties of the RC in relation to the supervision plan?

Compiling his own part of the supervision plan.

p.8
Regulatory Framework and Compliance

What is the significance of the TCP List mentioned in the Code?

It outlines the procedures for application for inclusion in a list of TCPs for the purposes of the BO.

p.8
Supervision Plans and Procedures

How are site supervision requirements assessed according to the Code?

They relate to the type and scale of the building works or street works involved.

p.15
Roles and Responsibilities of Personnel in Site Supervision

What is one responsibility of the RSE’s Representative?

Accountable to the RSE for implementing the RSE’s supervision plan.

p.31
Temporary Works and Their Management

What must the RC submit to the RSE for acknowledgment?

Certified plans, construction drawings, design justifications, and duly signed Forms TW1 and TW2.

p.3
Amendments and Revisions in Supervision Codes

What was adopted as the Code of Practice for Site Safety Supervision?

The draft code refined and adopted in November 2000.

p.16
Supervision Plans and Procedures

What is the purpose of the checklist devised by the RSE?

To carry out specific tasks.

p.31
Temporary Works and Their Management

What does the RSE/RGE provide to the RC for carrying out the works?

Written permission.

p.3
Amendments and Revisions in Supervision Codes

What did the revisions in the 2005 Code of Practice include?

Inclusion of quality supervision requirements and qualified supervision requirements for geotechnical works.

p.5
Roles and Responsibilities of Personnel in Site Supervision

What is the first section of the document?

Scope.

p.14
Roles and Responsibilities of Personnel in Site Supervision

What is one of the duties of the personnel assisting the AP?

Assisting the AP in carrying out safety management functions.

p.24
Reporting and Communication Protocols

What must the RC submit within 7 days after completion of temporary works?

A completion certificate to RSE for acknowledgement and record.

p.8
Supervision Plans and Procedures

What does this Code explain regarding site supervision?

It explains the procedures for establishing site supervision requirements for various types of building works or street works.

p.8
Roles and Responsibilities of Personnel in Site Supervision

What is the role of Technically Competent Persons (TCPs) according to the Code?

TCPs are deployed with specific duties related to site supervision.

p.6
Technical Competence of Supervisors

What qualifications are detailed in Appendix VII?

Qualifications of Competent Person (Logging) and TCPs with Academic Background in Geology.

p.27
Supervision Plans and Procedures

What forms must the RC submit upon receipt of signed Forms TW1 and TW2?

The certified plans and construction drawings with design justifications for the temporary works.

p.15
Roles and Responsibilities of Personnel in Site Supervision

What is one of the overall responsibilities of the RSE?

Assuming overall responsibilities in the appointment of his Representative and TCPs.

p.12
Reporting and Communication Protocols

What does the line of reporting signify in the safety management structure?

The hierarchy and accountability in safety supervision.

p.16
Quality Supervision Requirements

What must T5 check regarding site works?

Compliance with approved plans, design requirements, and method statements.

p.9
Amendments and Revisions in Supervision Codes

Who may review and adjust the supervision requirements?

The Building Authority (BA).

p.23
Safety Management in Building Works

What is the main concern regarding overstressing or overloading?

It should not endanger workers, the public, or adjoining buildings and lands.

p.17
Roles and Responsibilities of Personnel in Site Supervision

What is the RGE’s Representative accountable for?

The satisfactory execution of specific tasks and the responsibilities of junior TCPs.

p.13
Roles and Responsibilities of Personnel in Site Supervision

Who is accountable to the AP for the implementation of the supervision plan?

The AP’s Representative.

p.19
Safety Management in Building Works

What should the RC do if there are non-conformities posing imminent danger?

Notify the AP and follow up on any non-conformities or major site incidents.

p.15
Reporting and Communication Protocols

What is a duty of the RSE’s Representative regarding reports?

Coordinating and compiling reports on supervision activities including reports on non-conformity.

p.17
Quality Supervision Requirements

What is one of the duties of the RGE regarding TCPs?

Devising checklists of specific tasks for his TCPs.

p.16
Technical Competence of Supervisors

What does T5 validate on site?

Conditions related to design assumptions for temporary or permanent structures.

p.13
Safety Management in Building Works

What must the AP do if there are non-conformities posing imminent danger?

Notify the BA and follow up on any non-conformities.

p.20
Safety Management in Building Works

What overall responsibilities does the AS's Representative have?

Carrying out site safety measures and actions in accordance with the supervision plan.

p.31
Temporary Works and Their Management

What form does the TCP T4 in RC’s stream use to certify the completion of works?

Form TW3.

p.30
Regulatory Framework and Compliance

What documents must be kept at the site office for inspection by the BA?

Certified plans, construction drawings, test reports, supervision records, and acknowledged Form TW3.

p.20
Reporting and Communication Protocols

What does the AS's Representative coordinate and compile?

Reports on supervision activities.

p.3
Roles and Responsibilities of Personnel in Site Supervision

Who is the guidance of the Code intended for?

Authorized persons, registered structural engineers, registered geotechnical engineers, registered contractors, and other personnel in the building industry.

p.30
Quality Supervision Requirements

What should the RSE check regarding Form TW3?

The completeness of the form and whether the relevant HOKLAS Endorsed Certificate has been obtained.

p.24
Temporary Works and Their Management

What must the RC submit 21 days before commencing temporary works?

Plans and construction drawings with design justifications to RSE/RGE.

p.12
Safety Management in Building Works

What does TCP stand for in the context of safety management?

It refers to different levels or types of safety supervision.

p.23
Roles and Responsibilities of Personnel in Site Supervision

What qualifications should the person certifying the temporary works documents have?

Qualifications and experience not inferior to a TCP of grade T5.

p.27
Quality Supervision Requirements

What must the independent checking engineer (ICE) do after reviewing the plans prepared by the DE?

Certify in standard form (Form TW2) that the design of the temporary works has been checked and complies with relevant codes.

p.25
Supervision Plans and Procedures

What types of works require plans and construction drawings with design justifications in Case 2?

Falsework for concrete casting, formwork and shoring, temporary working platforms, and lifting operations.

p.22
Temporary Works and Their Management

In Case 3, what must be considered if temporary works may affect permanent structures?

Construction drawings and design justifications must be prepared, assessing effects on permanent structures and adjoining properties.

p.24
Roles and Responsibilities of Personnel in Site Supervision

What is the role of the AP/RSE/RGE in the temporary works process?

Prepare plans for the BA's approval and supervise the works.

p.11
Technical Competence of Supervisors

What are the minimum qualifications required for AP, RSE, and RGE?

They must satisfy the minimum qualifications and experience required for each grade of TCP as set out in Table 2 of the Technical Memorandum.

p.25
Supervision Plans and Procedures

What is the height requirement for retaining walls that necessitate plans and construction drawings?

Higher than 4 meters.

p.10
Supervision Plans and Procedures

What should be submitted as an annex to the supervision plan?

Confirmation of appointment of TCPs.

p.28
Temporary Works and Their Management

How many days before the commencement of works must the RC submit plans for temporary works?

Not later than 21 days.

p.13
Quality Supervision Requirements

What is a key duty of the AP related to non-conformities?

Establishing an efficient and effective mechanism for dealing with non-conformities.

p.28
Safety Management in Building Works

What should the RSE/RGE check regarding proposed temporary works?

If they affect permanent structures, adjoining buildings, lands, or geotechnical elements.

p.18
Roles and Responsibilities of Personnel in Site Supervision

What is one of the responsibilities of T2/T3 personnel?

Monitoring the work of the RC’s TCPs.

p.20
Safety Management in Building Works

What is one of the duties of the AS's Representative related to safety?

Directing staff and sub-contractors on safety-related matters.

p.20
Quality Supervision Requirements

What implementation plan must the AS's Representative ensure is executed on site?

The adoption of the mobile plant alert system and/or the tower crane alert system.

p.4
Regulatory Framework and Compliance

What are the terms for downloading the Code?

Subject to the terms and conditions stipulated on the website.

p.22
Temporary Works and Their Management

In Case 1, what is required for the temporary works and method statements?

They must be shown on prescribed plans, and both AP/RSE/RGE and RC have responsibilities to supervise the works.

p.12
Safety Management in Building Works

What is the responsibility of the Registered Structural Engineer (RSE)?

To ensure structural safety and compliance.

p.19
Roles and Responsibilities of Personnel in Site Supervision

What is one of the overall responsibilities of the RC regarding his Representative and TCPs?

Assuming overall responsibilities in the appointment of his Representative and TCPs.

p.10
Supervision Plans and Procedures

When should the supervision plan be submitted to the BA?

Prior to or at the same time as the application for the first consent for commencement of building works.

p.16
Roles and Responsibilities of Personnel in Site Supervision

To whom is the T5 accountable?

To the RSE through the RSE’s Representative.

p.13
Roles and Responsibilities of Personnel in Site Supervision

What is one of the overall responsibilities of the AP?

Assuming overall responsibilities in the appointment of his Representative and TCPs.

p.28
Temporary Works and Their Management

What must the RC submit for temporary works providing support to a tower crane?

Certified plans and construction drawings with design justifications, along with Forms TW1 and TW2.

p.18
Quality Supervision Requirements

What must be checked to ensure compliance on site?

Site works must comply with the approved plan, design requirements, and method statements.

p.26
Quality Supervision Requirements

Who should inspect and sign the completion certificate for temporary works?

The appointed T5 Person.

p.11
Supervision Plans and Procedures

Where can one find reference for the combination of duties of TCPs?

In paragraphs 8.12 to 8.17.

p.25
Reporting and Communication Protocols

How many days before the commencement of works must the documents be submitted to the RSE/RGE?

Not later than 21 days.

p.9
Roles and Responsibilities of Personnel in Site Supervision

What is the responsibility of the authorized person (AP), registered structural engineer (RSE), registered geotechnical engineer (RGE), and authorized signatory (AS)?

To jointly submit a supervision plan and carry out inspections according to that plan.

p.3
Amendments and Revisions in Supervision Codes

When was the supervision plan system first implemented?

December 1997.

p.18
Supervision Plans and Procedures

What is a key duty of personnel as per the checklist devised by the RGE?

Carrying out specific tasks.

p.9
Roles and Responsibilities of Personnel in Site Supervision

Who is responsible for ensuring TCPs meet qualification and experience requirements?

The AP, RSE, RGE, and AS.

p.9
Safety Management in Building Works

What is the role of the heads of the safety management structure?

To oversee the respective streams of safety management.

p.29
Quality Supervision Requirements

What is required for the test results to be considered valid?

They should be reported on a HOKLAS Endorsed Certificate or equivalent from recognized bodies.

p.21
Reporting and Communication Protocols

What should be done in case of non-conformities and site incidents?

Make a referral to the AS’s Representative and notify TCPs in other streams.

p.30
Regulatory Framework and Compliance

What regulations require load tests for lifting appliances?

Factories and Industrial Undertakings (Lifting Appliances and Lifting Gear) Regulations.

p.27
Roles and Responsibilities of Personnel in Site Supervision

What is the role of the design engineer (DE) in the temporary works for a tower crane?

To prepare and sign the plans and construction drawings with design justifications and certify compliance with relevant regulations.

p.10
Roles and Responsibilities of Personnel in Site Supervision

What should the head of the management structure have?

Overall responsibility and accountability for their respective stream.

p.23
Reporting and Communication Protocols

How many days before the commencement of works should the documents be submitted to the RSE/RGE?

21 days.

p.19
Supervision Plans and Procedures

What must the RC ensure regarding the supervision plan?

Full implementation of the supervision plan regarding his own stream.

p.10
Supervision Plans and Procedures

What is the submission timeline for the supervision plan for minor works?

Not less than 7 days before commencement of the minor works.

p.17
Supervision Plans and Procedures

What must the RGE ensure regarding the supervision plan?

The full implementation of the supervision plan regarding his own stream.

p.14
Roles and Responsibilities of Personnel in Site Supervision

What is one of the duties related to monitoring work?

Monitoring the work of the RC’s TCPs.

p.25
Quality Supervision Requirements

What additional requirement is needed to ensure temporary works do not adversely affect permanent structures?

Appointment of a qualified person to certify the documents.

p.19
Temporary Works and Their Management

What should the RC prepare for temporary works categorized as Case 2 and/or Case 3?

Plans, method statements, precautionary and protective measures.

p.28
Safety Management in Building Works

What must the RSE/RGE provide after verifying the safety of the temporary works?

Written permission to the RC for carrying out the works.

p.18
Regulatory Framework and Compliance

What document outlines the responsibilities and duties of site personnel?

The Technical Memorandum and this Code.

p.13
Roles and Responsibilities of Personnel in Site Supervision

What is one responsibility of the AP’s Representative?

Representing the AP as the formal point of contact in communication with other streams.

p.17
Safety Management in Building Works

What action must the RGE take regarding non-conformities that pose imminent danger?

Notifying the AP and following up on any non-conformities.

p.20
Reporting and Communication Protocols

What is the role of the AS's Representative in communication?

They represent the AS as the formal point of contact with other streams.

p.3
Amendments and Revisions in Supervision Codes

What does the Code of Practice for Site Supervision 2009 address?

Supervision requirements for carrying out minor works.

p.31
Temporary Works and Their Management

What must the RC submit within 7 days after completion of works?

The completion certificate and duly signed Form TW3.

p.3
Amendments and Revisions in Supervision Codes

What does the Code of Practice for Site Supervision 2009 (2024 Edition) include?

Amendments made in December 2023 and August 2024.

p.21
Quality Supervision Requirements

What is one of the key duties of personnel regarding temporary works?

Checking that assumptions made in the design of temporary works are validated on site.

p.20
Quality Supervision Requirements

How does the AS's Representative deal with non-conformities?

By addressing site incidents and assisting in investigations to prevent further occurrences.

p.21
Safety Management in Building Works

What is a routine responsibility of site supervisors?

Checking that site works comply with general site safety requirements.

p.12
Reporting and Communication Protocols

What is indicated by the lines of communication in the safety management structure?

The flow of information among personnel.

p.16
Roles and Responsibilities of Personnel in Site Supervision

What is one of the key responsibilities of T5?

Implementation of the supervision plan.

p.23
Temporary Works and Their Management

What additional requirements must be followed for temporary works supporting a tower crane?

Requirements as described under paragraph 4.12 of the Code.

p.8
Quality Supervision Requirements

How does the Code address non-conformities and site incidents?

It provides procedures for dealing with non-conformities and major/serious site incidents related to building works.

p.15
Supervision Plans and Procedures

What must the RSE ensure regarding the supervision plan?

Full implementation of the supervision plan regarding his own stream.

p.15
Roles and Responsibilities of Personnel in Site Supervision

What is a duty of the RSE concerning temporary works?

Giving permission to the RC for carrying out temporary works categorised as Case 3.

p.29
Regulatory Framework and Compliance

What must the test methods and criteria comply with for temporary works supporting the tower crane?

They must comply with the BO, relevant regulations, and codes of practice.

p.28
Quality Supervision Requirements

Who should check that the RC has followed the requirements for temporary works?

The AP/RSE/RGE.

p.13
Safety Management in Building Works

What must the AP’s Representative ensure regarding safety measures?

That the safety measures required under supervision plans are implemented on site.

p.3
Amendments and Revisions in Supervision Codes

What significant change occurred on 31 December 2005?

The Technical Memorandum for Supervision Plans 2005 and the Code of Practice for Site Supervision 2005 came into effect.

p.13
Quality Supervision Requirements

What is a duty of the AP related to site inspections?

Carrying out site inspections as necessary.

p.31
Temporary Works and Their Management

What type of tests must the RC appoint a laboratory to carry out?

Non-destructive tests on welds.

p.31
Temporary Works and Their Management

What should the RC do in case of doubt regarding the temporary works?

Consult RSE/RGE and submit the design of the temporary works.

p.30
Quality Supervision Requirements

What must the RSE confirm in their statement regarding the submitted documents?

That the documents are complete and that temporary works do not adversely affect permanent structures.

p.21
Quality Supervision Requirements

What should be checked for compliance with supervision plans?

Specialist aspects of work and temporary works must comply with submitted supervision plans.

p.25
Quality Supervision Requirements

What is the minimum qualification for the person certifying the documents in Case 3?

Not inferior to a TCP of grade T5.

p.13
Supervision Plans and Procedures

What does the AP need to compile as part of his duties?

His own part of the supervision plan.

p.19
Safety Management in Building Works

What system must the RC prepare an implementation plan for?

The mobile plant alert system and/or the tower crane alert system.

p.31
Temporary Works and Their Management

Who checks and certifies the plans prepared by the DE?

The ICE checks and certifies the plans in Form TW2.

p.28
Quality Supervision Requirements

What is required of the RC during the temporary works?

Continuous supervision of the works in accordance with the Code and supervision plan.

p.9
Supervision Plans and Procedures

When should the supervision plan be submitted?

Prior to or at the same time as the consent application for the building or street works.

p.29
Roles and Responsibilities of Personnel in Site Supervision

Who should review the test results for the temporary works?

TCP T4 in RC’s stream.

p.28
Technical Competence of Supervisors

Who should carry out welding of structural steel works?

Qualified welders.

p.28
Reporting and Communication Protocols

What should the RSE check regarding the completeness of documents?

Whether all documents have been submitted in an orderly manner and relevant forms are properly filled and signed.

p.30
Safety Management in Building Works

When should load tests or examinations of tower cranes be conducted?

Only after the RSE acknowledges Form TW3.

p.21
Roles and Responsibilities of Personnel in Site Supervision

Who is accountable to the AS in the supervision plan?

The representatives and personnel involved in site supervision.

p.16
Roles and Responsibilities of Personnel in Site Supervision

What is a duty of T3?

Monitoring the work of the RC’s TCPs.

p.6
Reporting and Communication Protocols

What standard forms are mentioned in Appendix XI?

Standard Forms TW1, TW2 and TW3.

p.16
Quality Supervision Requirements

What must T3 ensure regarding works?

That they comply with approved plans, method statements, and precautionary measures.

p.17
Reporting and Communication Protocols

What duty does the RGE’s Representative have in relation to reports?

Coordinating and compiling reports on supervision activities including reports on non-conformity.

p.31
Temporary Works and Their Management

What is the time frame for the RC to submit plans before the commencement of works?

21 days.

p.15
Safety Management in Building Works

What must the RSE do if there are non-conformities posing imminent danger?

Notify the AP and follow up on any non-conformities.

p.15
Quality Supervision Requirements

What is a duty of the RSE concerning site inspections?

Carrying out site inspections as necessary.

p.30
Reporting and Communication Protocols

What should be done within 7 days after the completion of works?

The AP should record the works and the RSE should acknowledge it.

p.9
Reporting and Communication Protocols

What should be kept on site for inspection by the BA?

The supervision plan.

p.20
Roles and Responsibilities of Personnel in Site Supervision

What must the AS's Representative ensure regarding line management and sub-contractors?

They must ensure they are conversant with the supervision plan and that good coordination and communication exists.

p.3
Amendments and Revisions in Supervision Codes

What updates were made in the September 2021 Edition of the Code?

Incorporated various corrigenda and amendments from 2015 to 2021.

p.29
Quality Supervision Requirements

What is the requirement for the laboratory appointed by the RC for non-destructive tests?

It should be accredited by HOKLAS or other mutually recognized accreditation bodies.

p.15
Safety Management in Building Works

What does the RSE’s Representative need to check on site?

If the safety measures meet the requirements of supervision plans.

p.16
Roles and Responsibilities of Personnel in Site Supervision

What is a common responsibility shared by T3 and T5?

Accountability to the RSE through the RSE’s Representative.

p.9
Supervision Plans and Procedures

What should the supervision plan specify?

The name of the TCPs appointed and the frequency of inspection and/or extent of supervision.

p.20
Roles and Responsibilities of Personnel in Site Supervision

To whom is the AS's Representative accountable?

To the AS for the implementation of the RC's supervision plan.

p.29
Quality Supervision Requirements

What must the RC ensure regarding the temporary works?

They must be carried out in accordance with certified plans and construction drawings and be structurally safe.

p.29
Reporting and Communication Protocols

What form must be submitted upon completion of the temporary works?

Form TW3 at Appendix XI.

p.29
Roles and Responsibilities of Personnel in Site Supervision

What should the T5 Person confirm in the standard form upon completion of the temporary works?

That the temporary works have been inspected and found satisfactory, and that the associated testing results are technically acceptable.

p.31
Temporary Works and Their Management

What should the RSE do within 14 days after completion of works for a free-standing tower crane?

Submit all relevant documents of the temporary works to BD for record.

p.21
Quality Supervision Requirements

What is required for subordinate TCPs regarding routine checks?

They must carry out routine checks at the correct frequency and prepare and file records on site.

p.3
Amendments and Revisions in Supervision Codes

What system was introduced under the Buildings (Amendment) Ordinance 2008?

The Minor Works Control System.

p.29
Roles and Responsibilities of Personnel in Site Supervision

Who can be the T5 Person for certifying completion of temporary works supporting a tower crane?

The DE or ICE.

p.21
Safety Management in Building Works

What must be checked regarding mobile plant and tower crane systems?

That the alert systems are properly installed and operating.

p.24
Temporary Works and Their Management

What is the first step in dealing with temporary works?

Determine if temporary works have any effect on permanent structures.