What is the maximum estimated settlement value for the pile?
15.6 mm.
Why must foundation settlements be estimated with great care?
For buildings, towers, power plants, and similar high-cost structures.
1/61
p.5
Settlement Estimation Methods

What is the maximum estimated settlement value for the pile?

15.6 mm.

p.2
Settlement Estimation Methods

Why must foundation settlements be estimated with great care?

For buildings, towers, power plants, and similar high-cost structures.

p.5
Settlement Estimation Methods

What is the necessary length of the pile to endure the overall load?

29 m.

p.2
Settlement Estimation Methods

What are the components of pile settlement prediction?

A sum of pile heel settlement and elastic deformation of the pile.

p.2
Settlement Estimation Methods

What can excessive settlement and differential movement cause?

Distortion and cracking in structures, especially for rotary machines.

p.4
Settlement Estimation Methods

What is the stress-strain modulus of soil below the pile point for dense sands?

>100 MPa.

p.2
Design Requirements for Power Plant Foundations

Why was a piled foundation chosen for the gas turbine structure?

Due to the soil's capacity to undergo great stresses and special equipment requirements.

p.4
Soil Properties Analysis

What is the unit weight of the clayey deposit at levels 98-95 m?

19.5 kN/m³.

p.7
Finite Element Method in Foundation Design

Which software was used to obtain reliable results of pile settlements?

Plaxis 3D Foundation package.

p.4
Settlement Estimation Methods

How is total settlement assessed for bored piles foundation?

As the sum of axial and point settlement.

p.5
Finite Element Method in Foundation Design

What model was used in Plaxis 3D Foundation for deformation analysis?

Elastic-plastic Mohr-Coulomb model.

p.6
Static Load Testing of Piles

What type of concrete was used for the test pile?

C30/37.

p.1
Settlement Estimation Methods

What was the settlement value of elastic deformation from vertical compressive loads?

2.1 mm.

p.5
Settlement Estimation Methods

What is the reduction factor set for the analysis?

0.75.

p.6
Static Load Testing of Piles

What is the length of the test pile mentioned in the static load pile test?

28.6 m.

p.2
Settlement Estimation Methods

What is the maximum allowable settlement according to guidelines?

Less than 2% of the diameter of the pile (D).

p.6
Static Load Testing of Piles

How was the load increased during the static load pile test?

Gradually, by 250 kN every hour.

p.1
Settlement Estimation Methods

What is the main focus of the paper?

Estimation of settlements of bored piles foundation at the Elektrenai power plant in Lithuania.

p.4
Soil Properties Analysis

What is the thickness of the clayey deposit at levels 95-83 m?

12 m.

p.4
Soil Properties Analysis

What is the shearing resistance value (φ') for the medium to firm consistency clayey deposit?

10º.

p.6
Settlement Estimation Methods

What is the purpose of estimating a constant average stiffness for each soil layer?

To enable relatively fast computations and obtain a first estimation of deformations.

p.1
Design Requirements for Power Plant Foundations

What were the dimensions of the piles used in the foundation?

880 mm in diameter and 29 m long.

p.4
Settlement Estimation Methods

What is the Poisson ratio (μ) for sand soil?

0.3.

p.2
Geotechnical Investigation Techniques

What types of tests were used to estimate soil properties?

Cone penetration tests, dynamic penetration tests, boreholes, excavations, and laboratory investigations.

p.6
Static Load Testing of Piles

What equipment was used to measure pile top displacements?

Dial gauges with an accuracy of 0.1 mm.

p.1
Comparison of Settlement Calculation Methods

What are some of the methods used for settlement calculation?

Bowles method, Schmertmann methods, EN 1997-2 method, NEN 6743 method, and finite element method in Plaxis 3D Foundation.

p.7
Static Load Testing of Piles

What does the green curve in the time-settlement curve represent?

Experimental results of the static load pile test.

p.5
Settlement Estimation Methods

What is the maximum allowable foundation settlement for a pile with a diameter of 880 mm?

16 mm.

p.5
Geotechnical Investigation Techniques

What software was used for computing settlements of bored piles foundation?

Geo5 software (Pile CPT) and Plaxis 3D Foundation.

p.2
Settlement Estimation Methods

What complicates foundation design significantly?

Soil parameters must be obtained on-site prior to project calculation.

p.1
Settlement Estimation Methods

What is the maximum allowable foundation settlement for the structure?

16 mm.

p.2
Settlement Estimation Methods

What is the total estimated settlement value for the pile foundation at Elektrenai power plant?

15.6 mm, including 2.1 mm from elastic deformation.

p.5
Settlement Estimation Methods

What does the limit loading curve describe?

The variation of vertical load as a function of the pile settlement.

p.6
Static Load Testing of Piles

What was the settlement value reached after the basic design load of 2500 kN?

5.2 mm.

p.3
Soil Properties Analysis

What is the significance of the N values obtained from the SPT?

They provide useful information regarding the consistency of cohesive soils and the relative density of cohesionless soils.

p.1
Settlement Estimation Methods

What was the pile toe settlement value found in the analysis?

13.5 mm.

p.7
Settlement Estimation Methods

Which method provided the largest value of bored pile settlement?

The analytical Bowles method.

p.7
Reliability and Safety Factors in Foundation Engineering

What is the significance of choosing appropriate safety factors?

It is important for the specific foundation type considering remarks from EN 1997-2 and Tomlinson criteria.

p.4
Settlement Estimation Methods

What is the maximum applied load at the pile head?

2239 kN.

p.7
Settlement Estimation Methods

What does Bowles’ settlement criterion serve as in the analysis?

A conservative limit, indicating that real settlement should be lower than the estimated value.

p.7
Settlement Estimation Methods

What standards and approaches were employed for pile settlement analysis?

EN 1997-2, NEN 6743, Schmertmann and Bowles, and finite element method.

p.6
Comparison of Settlement Calculation Methods

What was the immediate settlement measured for the Bowles method with a pile length of 29 m?

15.9 mm.

p.7
Design Requirements for Power Plant Foundations

What is the most appropriate method for this project according to the conclusions?

The EN 1997-2 ultimate limit stage method.

p.4
Settlement Estimation Methods

What is the elastic modulus of the pile (Ep) for a compressive strength (ckf) of 30 MPa?

32,000 MPa.

p.5
Settlement Estimation Methods

Which standards were followed for pile settlement analysis?

EN 1997-2, NEN 6743, and Schmertmann.

p.4
Settlement Estimation Methods

What is the embedment factor (FI) value used in the estimation?

0.50.

p.3
Design Requirements for Power Plant Foundations

What type of piles were adopted for the foundation in the study?

Bored cast-in-place piles with a diameter of 880 mm.

p.3
Geotechnical Investigation Techniques

What methods were used for soil investigation at the Elektrenai power plant site?

Boreholes, cone penetration tests (CPT), dynamic penetration tests (DPSH), and trial pits.

p.3
Design Requirements for Power Plant Foundations

What is the main purpose of a foundation in engineering?

To receive loads from equipment and transmit these loads to the piles.

p.3
Design Requirements for Power Plant Foundations

What are the three main steps in designing a deep pile foundation?

1. Determine DWL and SWL for a single pile. 2. Obtain bearing capacities and related settlements for several pile lengths. 3. Check the actual behavior of several grids of piles under the foundation slab.

p.5
Finite Element Method in Foundation Design

What parameters are involved in the Mohr-Coulomb model?

E, ν for soil elasticity; ϕ, c for soil plasticity; ψ as an angle of dilatancy.

p.6
Static Load Testing of Piles

What is the maximum load capacity of the hydraulic jack used in the testing equipment?

5650 kN.

p.3
Soil Properties Analysis

What geological layers were identified in the investigation area?

1. Medium to firm clay sediment. 2. Medium to coarse silty sand, dense. 3. Medium to coarse silty sand, medium dense. 4. Medium to coarse silty sand, very dense.

p.6
Static Load Testing of Piles

What was the diameter of the test and reaction piles?

880 mm.

p.3
Design Requirements for Power Plant Foundations

What does SWL stand for in foundation design?

Safe Working Load.

p.1
Geotechnical Investigation Techniques

What types of tests were conducted to gather soil data?

Cone and dynamic penetration tests, boreholes, and laboratory tests.

p.3
Geotechnical Investigation Techniques

How many boreholes were drilled during the soil investigation?

8 boreholes.

p.2
Design Requirements for Power Plant Foundations

What is the significance of the combined unit of gas turbine, generator, and steam turbine?

It induces high loads, requiring adequate resistance from the foundation.

p.3
Soil Properties Analysis

What is the depth range of the limnoglacial sediments found during the investigation?

From 13.20 m to 15.80 m.

p.1
Comparison of Settlement Calculation Methods

How many methods were employed for settlement calculation?

Five methods.

p.1
Impact of Soil Capacity on Foundation Design

Why was a piling solution adopted for the power plant?

Due to insufficient soil capacity to support great stresses and high requirements for slab settlements and bearing capacity.